QIFAN / Cases

Project scope

Qifan supplied submarine and armored offshore cables for CGN’s Yangjiang Fanshi I wind project off the coast of Guangdong.

Location
Offshore Guangdong, China
Project type
Renewable Energy – Offshore Wind
Products supplied
Submarine Power Cables (MV), Armored Offshore Cables

Project overview

Developed by China General Nuclear Power Group, the offshore wind farm has a planned capacity exceeding 400 MW. Its marine setting calls for cables designed for corrosion resistance and long-term electrical reliability.

  • ('heading', 'Project overview')
  • ('text', 'Developed by China General Nuclear Power Group, the offshore wind farm has a planned capacity exceeding 400 MW. Its marine setting calls for cables designed for corrosion resistance and long-term electrical reliability.')

Scope of supply

  • 66 kV submarine cables for inter-array and export connections.
  • Steel-wire-armored offshore cables for mechanical protection.

Implementation and support

The project account describes development and testing for water depth, temperature and salinity, with third-party testing. Qifan also supported cable laying, joint installation and insulation testing. The source reports that the project entered operation in 2024.

  • ('heading', 'Implementation and support')
  • ('text', 'The project account describes development and testing for water depth, temperature and salinity, with third-party testing. Qifan also supported cable laying, joint installation and insulation testing. The source reports that the project entered operation in 2024.')