QIFAN / Cases
Project scope
Qifan supplied submarine and armored offshore cables for CGN’s Yangjiang Fanshi I wind project off the coast of Guangdong.
- Location
- Offshore Guangdong, China
- Project type
- Renewable Energy – Offshore Wind
- Products supplied
- Submarine Power Cables (MV), Armored Offshore Cables
Project overview
Developed by China General Nuclear Power Group, the offshore wind farm has a planned capacity exceeding 400 MW. Its marine setting calls for cables designed for corrosion resistance and long-term electrical reliability.
- ('heading', 'Project overview')
- ('text', 'Developed by China General Nuclear Power Group, the offshore wind farm has a planned capacity exceeding 400 MW. Its marine setting calls for cables designed for corrosion resistance and long-term electrical reliability.')
Scope of supply
- 66 kV submarine cables for inter-array and export connections.
- Steel-wire-armored offshore cables for mechanical protection.
Implementation and support
The project account describes development and testing for water depth, temperature and salinity, with third-party testing. Qifan also supported cable laying, joint installation and insulation testing. The source reports that the project entered operation in 2024.
- ('heading', 'Implementation and support')
- ('text', 'The project account describes development and testing for water depth, temperature and salinity, with third-party testing. Qifan also supported cable laying, joint installation and insulation testing. The source reports that the project entered operation in 2024.')